During the London 2012 Olympics there were issues surrounding the install of refrigerated containers
into St. James Park just off Pall Mall.
The Royal Parks were extremely concerned regards damage to trees and grass and the environmental impact of running refrigerated containers within this area.
Spacewise solution was to use low noise, low energy machines. The details of these were scrutinized and subsequently passed by The Royal Parks as being acceptable.
Spacewise then installed the containers using highly skilled and trained HIAB Crane Operators under supervision of The Royal Parks to ensure we did not even knock a leaf off!